Mochovce Nuclear Power Plant Completion

“ENSECO pipelines are installed across the entire nuclear island of 3. Units 3 and 4 at Mochovce. This is proof that we have survived as a company."

500

Workers

We have managed approximately 500 workers and another 250 workers under the management of our subcontractors.

1509

Tons of installed materials

We have procured, supplied and installed materials with the total weight of 1 509 tons.

10722

Valves

We have installed 10 722 valves and our work is visible in both units of the power plant.

40

Systems tested

During commissioning, we have performed non-active testing of 40 technological systems.

9646

Pipelines

We have installed a total of 9 646 pipelines in both units.

5

Main systems

Works involved 5 main elementary systems at all project stages.

Nuclear Power Plant –Systems Executed

The project was executed based on the EPC contract at all stages (elaboration of detailed design documentation, procurement, installation and commissioning).

“We are most proud of the systems that we have built here. They demonstrate our skills, technical abilities and business know-how.”

We took part in five main nuclear power plant systems

Primary Circuit Auxiliary Systems

  • Continuous primary coolant purification system
  • Volume and boron control system including oil system
  • Spent fuel pool water cooling system
  • Hydrogen recombination system
  • Primary coolant controlled leakage system
  • Lifting equipment
  • Connecting piping
  • Technological platforms
  • Steam generator blowdown system
  • Biological shielding

Radioactive Waste Treatment System

  • Primary circuit drain water treatment system
  • Active water collection system
  • Distillation plant
  • Additional condensate polishing
  • Active water purification
  • Lifting equipment
  • Connecting piping
  • Boric acid recovery system H3BO3
  • Chemical reagents preparation system
  • Radioactive gas treatment system
  • Spent fuel storage pool and ECCS tanks water purification system
  • Steam generator blowdown purification system
  • Technological platforms
  • Biological shielding

Emergency Core Cooling and Spray Systems

  • Emergency core cooling systems
  • Pressure suppression containment system
  • Lifting equipment
  • Technological platforms

Radioactive Waste Management

  • Special sewerage
  • Radioactive liquid and solid waste storage
  • Tank vent treatment system
  • Liquid radioactive waste transport
  • Lifting equipment
  • Technological platforms
  • Biological shielding

Radioactive Waste Disposal Systems

  • Radioactive Waste Disposal Systems
  • Electrical part

28t

Carbon

Pipe fittings

110t

Carbon

Valve remote control

80t

Carbon

Pipe and valve support

50t

Carbon

Pipes

195t

Stainless – 08CH18N10T

Pipe fittings

26t

Stainless – other

Pipe fittings

450 t

Carbon

Platforms

480t

Stainless – 08CH18N10T

Pipes

90t

Stainless – other

Pipes

1509t

Total

COMPONENT MATERIAL QUANTITY (IN PIECES)
Unit 3 Unit 2 Stainless 5574
Unit 3 Unit 2 Carbon 1255
Unit 4 Unit 2 Stainless 2944
Unit 4 Unit 2 Carbon 949
TOTAL: 10722
MATERIAL CS – CARBON STEEL; SS – STAINLESS STEEL
Safety Class I., II., III., N
Seismicity 1a, 1b, 2a, 2b
DN 6, 8, 10, 15, 25, 32, 40, 50, 65, 80, 100, 125, 150, 200, 250, 300, 500, 600
PN 10, 16, 40, 100, 160, 200, 230, 250, 315, 400, 500